ROAD CLOSURES
Cardigan Road, Marlborough: From its junction with Cross Lane to its junction with Hyde Lane to enable Gigaclear Limited to carry out installation of chambers, duct and toby boxes for Gigaclear fibre optic network.
Alternative route via Hyde Lane - Cross Lane and vice versa.
This order will come into operation on May 17 and the closure will be required for one day.
Church Road (Part), Stanton St Bernard: From outside property known as No.01 Church Walk for a distance of approximately 25m in an easterly direction to enable Wessex Water to provide service and associated works.
Alternative route via Church Road (unaffected length) - Coate Road - Great Barn Road - Pewsey Road - Church Road (unaffected length) and vice versa.
This order will come into operation on May 17 and the closure will be required for three days.
C76 (Part), Tockenham and Brinkworth: From its property known as Manor House, Tockenham for a distance of approximately 610m in a northerly direction to enable Network Rail Infrastructure Ltd to carry out vegetation removal, brickwork repairs and other associated works.
Alternative route via C76 (unaffected length) - C122 - A3102 - C76 (unaffected length) and vice versa.
This order will come into operation on May 15 and the closure will be required between the hours of 22:00 and 06:00 for four nights.
C88 (Part), Brinkworth: From its junction with C106 for a distance of approximately 160m in a southerly direction to enable Wessex Water to carry out a chamber replacement to repair a service and other associated works. Alternative route via C88 (unaffected length) - B4042 - C76 - C88 (unaffected length) and vice versa.
This order will come into operation on May 17 and the closure will be required for three days.
Back Lane (Part), Marlborough: From its junction with Cross Lane to its junction with Hyde Lane to enable Gigaclear Limited to carry out installation of chambers, duct and toby boxes for Gigaclear fibre optic network.
Alternative route via Hyde Lane - Cardigan Road - Cross Lane and vice versa.
This order will come into operation on May 18 and the closure will be required until May 24.
FOOTPATH CLOSURES
Footpath 30, Sherston: From its junction with Tetbury Road to its junction with Easton Town to enable undertaking of work associated with installing a sewerage scheme. Alternative route using public highways.
This order will come into operation on May 15 and the closure will be required until July 10.
Footpath 62 (Part), Calne: From its junction with Sand Pit Road for a distance of approximately 32m in a south westerly direction to enable improvements to footpath and installing dropped kerb and tactile paving.
Alternative route via footpath 62 (unaffected length) - Comet Crescent - Hastings Drive - Sand Pit Road and vice versa.
This order will come into operation on May 15 and the closure will be required until May 26.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here